Installation
Position. Press into place. Done.
Compare the installation sequence: from positioning the brackets to the removable module. A 3-metre module is shown; bracket numbers depend on building height and design.
Patented bracket
PMV and patented bracket in cross-section
The edges of the PMV profile engage with the patented bracket. At the module joint, two adjacent profiles share one bracket.
Joint bracket at the start · second bracket at 1.5 m · joint bracket at the end, shared with the next module.
Press the coping down evenly. The profile edges engage.
- 01
Fit the patented brackets
One bracket at the module joint, the second at 1.5 m. The required number depends on the building height.
- 02
Press the coping into place
The coping is pressed vertically onto the brackets and secured by positive engagement with their geometry. Installation is carried out in accordance with the installation instructions.
- 03
Installed and easy to maintain
Each module can be released individually and properly refitted. This keeps the parapet surface accessible, for example for maintenance work or inspecting the lightning protection system.
Experience from the field
“For installing approximately 20 metres, the standard system requires around 5 hours just for the fastening brackets. With the patented parapet coping system, it takes only 3 hours.”